<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:media="http://search.yahoo.com/mrss/"
	>

<channel>
	<title>Slade Architects</title>
	<link>http://cargocollective.com</link>
	<description>Slade Architects</description>
	<pubDate>Sun, 14 Feb 2016 17:16:26 +0000</pubDate>
	<generator>http://cargocollective.com</generator>
	<language>en</language>
	
		
	<item>
		<title>Seismic Upgrade And Refurbishment Of ANZ Building</title>
				
		<link>http://cargocollective.com/sladearchitects/Seismic-Upgrade-And-Refurbishment-Of-ANZ-Building</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/Seismic-Upgrade-And-Refurbishment-Of-ANZ-Building</comments>

		<pubDate>Sun, 14 Feb 2016 17:16:26 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">11107811</guid>

		<description>SEISMIC UPGRADE AND REFURBISHMENT OF ANZ BUILDING 170 – 186 FEATHERSTON ST, WELLINGTON&#60;br /&#62;
&#60;br /&#62;
The original building was designed in the late 1960s and as with many other buildings in Wellington was in need of seismic strengthening works to satisfy concerns following the Christchurch earthquakes. The works included upgraded foundations and strengthening of shear walls from the Basement to Level 6 along with full floor fitout refurbishments and re-roofing.The Ground Floor required the additional work to provide for wheelchair access, fitout for  the building’s reception function and as a fully equipped meeting suite, complete with full AV facilities.  The floor was subdivided to provide a separate lettable retail space for Noel Leeming.&#60;br /&#62;
&#60;br /&#62;
The building provides for general open plan office space with associated meeting rooms and specialist Telepresence facilities.  Level 10 is fitted out as a Training Facility.&#60;br /&#62;
&#60;br /&#62;
Approx. Project Value - $13,000,000&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
 &#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_1_905.jpg" data-mid="59645893" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_2_905.jpg" data-mid="59645894" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_3_905.jpg" data-mid="59645896" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_4_905.jpg" data-mid="59645899" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_5_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_5_905.jpg" data-mid="59645900" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_6_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107811/ANZ_seismic_6_905.jpg" data-mid="59645902" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>SEISMIC UPGRADE AND REFURBISHMENT OF ANZ BUILDING 170 – 186 FEATHERSTON ST, WELLINGTON  The original building was designed in the late 1960s and as with many other b...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload440.cargocollective.com/1/11/352252/11107811/prt_1455491659.jpg" />

	</item>
		
		
	<item>
		<title>ANZ Private Bank Fitout – 1 Victoria Street, Wellington </title>
				
		<link>http://cargocollective.com/sladearchitects/ANZ-Private-Bank-Fitout-1-Victoria-Street-Wellington</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/ANZ-Private-Bank-Fitout-1-Victoria-Street-Wellington</comments>

		<pubDate>Sun, 14 Feb 2016 17:13:58 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">11107797</guid>

		<description>ANZ PRIVATE BANK FITOUT – 1 VICTORIA STREET, WELLINGTON &#60;br /&#62;
&#60;br /&#62;
This Project comprised a part floor fitout for the Bank’s high value private clients.  The works comprised a high quality Reception Area, Lounge and associated Private Meeting Rooms with AV presentation facilities.&#60;br /&#62;
&#60;br /&#62;
The works included coordination of selections of furniture and artworks and integration into the built environment.&#60;br /&#62;
&#60;br /&#62;
Approx. Project Value - $600,000&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank1_905.jpg" data-mid="59645803" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank2_905.jpg" data-mid="59645804" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank3_905.jpg" data-mid="59645806" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload440.cargocollective.com/1/11/352252/11107797/anz_private_bank4_905.jpg" data-mid="59645807" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>ANZ PRIVATE BANK FITOUT – 1 VICTORIA STREET, WELLINGTON   This Project comprised a part floor fitout for the Bank’s high value private clients.  The works comprised ...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload440.cargocollective.com/1/11/352252/11107797/prt_1455491359.jpg" />

	</item>
		
		
	<item>
		<title>ANZ National Bank Ltd Campus</title>
				
		<link>http://cargocollective.com/sladearchitects/ANZ-National-Bank-Ltd-Campus</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/ANZ-National-Bank-Ltd-Campus</comments>

		<pubDate>Sun, 30 Jun 2013 16:38:26 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906812</guid>

		<description>ANZ NATIONAL BANK LTD CAMPUS&#60;br /&#62;
&#60;br /&#62;
We have successfully provided professional architectural services to the National Bank of New Zealand Limited for nearly 30 years and have added ANZ to our client base for the last 10 years following their purchase of the National Bank. The Practice continues to provide high quality outcomes to a variety of accommodation demands. Our work for the Bank has includes a new 5 storey building, new fitouts, alterations to fitouts to minor furniture layouts. Recently we have assisted the bank in reducing its Welllington rental liability by increasing the efficiency of use of their existing portfolio. This has involved complete refurbishments in some of their occupied space and alterations to other floors. Some images of new / altered floors are shown below.&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im1_o.jpg" data-mid="31977546" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im2_o.jpg" data-mid="31977551" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im3_o.jpg" data-mid="31977552" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906812/ANZ-nat_im4_o.jpg" data-mid="31977554" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>ANZ NATIONAL BANK LTD CAMPUS  We have successfully provided professional architectural services to the National Bank of New Zealand Limited for nearly 30 years and...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906812/prt_1372628174.jpg" />

	</item>
		
		
	<item>
		<title>School Of Medicine, Wellington, NZ</title>
				
		<link>http://cargocollective.com/sladearchitects/School-Of-Medicine-Wellington-NZ</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/School-Of-Medicine-Wellington-NZ</comments>

		<pubDate>Sun, 30 Jun 2013 16:29:50 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906744</guid>

		<description>SCHOOL OF MEDICINE, WELLINGTON, NEW ZEALAND&#60;br /&#62;
&#60;br /&#62;
The Practice was engaged to undertake the refurbishment of Levels F, G and J of the School of Medicine for the University of Otago. The original floors had not been upgraded since the 1970s and were in poor condition. The resultant fitouts have been very well received and have transformed the working environment. As a result we have been engaged to continue the refurbishment of other floors in the building. &#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906744/med_im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906744/med_im1_o.jpg" data-mid="31977362" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906744/med_im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906744/med_im2_o.jpg" data-mid="31977366" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906744/med_im3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906744/med_im3_o.jpg" data-mid="31977371" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906744/med_im4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906744/med_im4_o.jpg" data-mid="31977372" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>SCHOOL OF MEDICINE, WELLINGTON, NEW ZEALAND  The Practice was engaged to undertake the refurbishment of Levels F, G and J of the School of Medicine for the...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906744/prt_1372627629.jpg" />

	</item>
		
		
	<item>
		<title>NZ Immigration Service Fitout</title>
				
		<link>http://cargocollective.com/sladearchitects/NZ-Immigration-Service-Fitout</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/NZ-Immigration-Service-Fitout</comments>

		<pubDate>Sun, 30 Jun 2013 16:21:42 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906714</guid>

		<description>NEW ZEALAND IMMIGRATION SERVICE FITOUT LEVELS 5 &#38; 6 STATE INSURANCE BUILDING, PALMERSTON NORTH&#60;br /&#62;
&#60;br /&#62;
A new public branch for the NZ Immigration Service on Level 5 and fitout on Level 6 for the student processing team. This project involved stripping the existing floors back to the building shell, the installation of new ceilings, lighting, floor coverings etc and fully fitting out with large amounts of purpose designed joinery. The work included the coordination of separate furniture supply contracts.&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906714/NZimm_im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906714/NZimm_im1_o.jpg" data-mid="31977166" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906714/NZimm_im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906714/NZimm_im2_o.jpg" data-mid="31977172" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>NEW ZEALAND IMMIGRATION SERVICE FITOUT LEVELS 5 &#38; 6 STATE INSURANCE BUILDING, PALMERSTON NORTH  A new public branch for the NZ Immigration Service on Level 5 and...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906714/prt_1372627228.jpg" />

	</item>
		
		
	<item>
		<title>ANZ Corporate Box, Wespac Stadium</title>
				
		<link>http://cargocollective.com/sladearchitects/ANZ-Corporate-Box-Wespac-Stadium</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/ANZ-Corporate-Box-Wespac-Stadium</comments>

		<pubDate>Sun, 30 Jun 2013 16:15:44 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906704</guid>

		<description>REFURBISHMENT OF ANZ CORPORATE BOX AT WESTPAC STADIUM WELLINGTON&#60;br /&#62;
&#60;br /&#62;
The ANZ Corporate Box had not been refurbished or updated since the Stadium opened more than a decade previously. The Practice was engaged to provide ideas for enhancing the space, including updating of joinery items and atmosphere so that the space could be used for both entertainment and business meetings. &#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im1_o.jpg" data-mid="31977022" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im2_o.jpg" data-mid="31977025" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906704/ANZbox_im3_o.jpg" data-mid="31977027" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>REFURBISHMENT OF ANZ CORPORATE BOX AT WESTPAC STADIUM WELLINGTON  The ANZ Corporate Box had not been refurbished or updated since the Stadium opened more than a...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906704/prt_1372626841.jpg" />

	</item>
		
		
	<item>
		<title>Beacon Hill Signal Station</title>
				
		<link>http://cargocollective.com/sladearchitects/Beacon-Hill-Signal-Station</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/Beacon-Hill-Signal-Station</comments>

		<pubDate>Sun, 30 Jun 2013 16:08:12 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906668</guid>

		<description>BEACON HILL SIGNAL STATION FOR THE WELLINGTON REGIONAL COUNCIL&#60;br /&#62;
&#60;br /&#62;
The Beacon Hill Signal Station sits on top of Beacon Hill and overlooks the Wellington Harbour Heads and Barretts Reef and controls shipping activity in and out of the Port of Wellington. The original station is a timber framed building constructed in the 1890s and no longer satisfies current operational and technical needs. We were commissioned to design a new station which satisfies the needs of 21st Century communications, radar and radio systems while operating in an extremely harsh and exposed environment. A marine theme was adopted – this project was successfully completed at the end of 2009 under tight budgetary restrictions.&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im1_o.jpg" data-mid="31976858" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im2_o.jpg" data-mid="31976863" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im4_o.jpg" data-mid="31976870" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im5_905.jpg" width="905" height="1200" width_o="905" height_o="1200" src_o="//payload180.cargocollective.com/1/11/352252/5906668/beacon_im5_o.jpg" data-mid="31976874" border="0" align="left" data-title="905 — 905 × 1200"/&#62;</description>
		
		<excerpt>BEACON HILL SIGNAL STATION FOR THE WELLINGTON REGIONAL COUNCIL  The Beacon Hill Signal Station sits on top of Beacon Hill and overlooks the Wellington Harbour Heads...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906668/prt_1372626414.jpg" />

	</item>
		
		
	<item>
		<title>The Open Polytechnic Of NZ</title>
				
		<link>http://cargocollective.com/sladearchitects/The-Open-Polytechnic-Of-NZ</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/The-Open-Polytechnic-Of-NZ</comments>

		<pubDate>Sun, 30 Jun 2013 15:54:03 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906607</guid>

		<description>KANUKA — NEW FACULTY BUILDING &#60;br /&#62;
— STAFF OFFICE BUILDING FOR THE OPEN POLYTECHNIC OF NEW ZEALAND&#60;br /&#62;
&#60;br /&#62;
A growing staff was putting pressure on outdated office accommodation at the Open Polytechnic. We were engaged to provide concept plans for the development of the campus as a whole. Staff had been located in various substandard buildings and prefabs.  This project provided office accommodation for tutorial and administration staff. The building is naturally ventilated with opening windows in offices venting through to the atrium space and uses natural light to reduce energy consumption. The atrium provides a pleasant and practical space for circulation and staff relaxation.&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im2_905.jpg" width="905" height="1134" width_o="905" height_o="1134" src_o="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im2_o.jpg" data-mid="31976519" border="0" align="left" data-title="905 — 905 × 1134"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im1_905.jpg" width="905" height="1134" width_o="905" height_o="1134" src_o="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im1_o.jpg" data-mid="31976530" border="0" align="left" data-title="905 — 905 × 1134"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906607/Kanuka_im3_o.jpg" data-mid="31976535" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>KANUKA — NEW FACULTY BUILDING  — STAFF OFFICE BUILDING FOR THE OPEN POLYTECHNIC OF NEW ZEALAND  A growing staff was putting pressure on outdated office acc...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906607/prt_1372625480.jpg" />

	</item>
		
		
	<item>
		<title>Regional Council Ground Floor</title>
				
		<link>http://cargocollective.com/sladearchitects/Regional-Council-Ground-Floor</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/Regional-Council-Ground-Floor</comments>

		<pubDate>Sun, 30 Jun 2013 15:47:02 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906572</guid>

		<description>REFURBISHMENT GROUND AND FIRST FLOORS, REGIONAL COUNCIL CENTRE FOR THE GREATER &#60;br /&#62;
WELLINGTON REGIONAL COUNCIL&#60;br /&#62;
&#60;br /&#62;
The Ground Floor of the Regional Council Centre was poorly and inefficiently planned. The main building entrance was not obvious to the street and the canopy was in poor repair and leaking. This project included the relocation of the main entrance, redesign of the canopy and the complete redesign and refurbishment of the ground floor tenancy space to include a new reception area and suite of meeting rooms. The lift interiors were also upgraded.&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im1_o.jpg" data-mid="31976370" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im2_o.jpg" data-mid="31976374" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im3_o.jpg" data-mid="31976378" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906572/reg-ground-im4_o.jpg" data-mid="31976382" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>REFURBISHMENT GROUND AND FIRST FLOORS, REGIONAL COUNCIL CENTRE FOR THE GREATER  WELLINGTON REGIONAL COUNCIL  The Ground Floor of the Regional Council Centre was...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906572/prt_1372625080.jpg" />

	</item>
		
		
	<item>
		<title>Regional Council Transport Division</title>
				
		<link>http://cargocollective.com/sladearchitects/Regional-Council-Transport-Division</link>

		<comments>http://cargocollective.com/sladearchitects/following/sladearchitects/Regional-Council-Transport-Division</comments>

		<pubDate>Sun, 30 Jun 2013 15:32:40 +0000</pubDate>

		<dc:creator>Slade Architects</dc:creator>
		
		<category><![CDATA[]]></category>

		<guid isPermaLink="false">5906534</guid>

		<description>NEW FITOUT LEVEL 6, REGIONAL COUNCIL CENTRE FOR THE GREATER WELLINGTON REGIONAL COUNCIL TRANSPORT DIVISION&#60;br /&#62;
&#60;br /&#62;
The Greater Wellington City Council’s Transport Division was expanding to cope with increased workloads in relation to changes to the region’s transport needs in terms of both the rail network and bus services.  Their accommodation did not cater for the increased staff numbers or provide an efficient and modern work environment. The new fitout addressed these practical issues in an imaginative and cost effective way using relevant themes, colours and finishes to provide a light, flexible and comfortable workplace.&#60;br /&#62;
&#60;br /&#62;
&#60;br /&#62;
&#60;img src="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_4_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_4_o.jpg" data-mid="31976189" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_1_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_1_o.jpg" data-mid="31976201" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_3_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_3_o.jpg" data-mid="31976204" border="0" align="left" data-title="905 — 905 × 550"/&#62;&#60;img src="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_2_905.jpg" width="905" height="550" width_o="905" height_o="550" src_o="//payload180.cargocollective.com/1/11/352252/5906534/reg_council_im_2_o.jpg" data-mid="31976208" border="0" align="left" data-title="905 — 905 × 550"/&#62;</description>
		
		<excerpt>NEW FITOUT LEVEL 6, REGIONAL COUNCIL CENTRE FOR THE GREATER WELLINGTON REGIONAL COUNCIL TRANSPORT DIVISION  The Greater Wellington City Council’s Transport Division ...</excerpt>

		<!--<wfw:commentRss></wfw:commentRss>-->

		<media:thumbnail url="//payload180.cargocollective.com/1/11/352252/5906534/prt_1372624293.jpg" />

	</item>
		
	</channel>
</rss>