Running on
Cargo
Green house (2013)
Deconstruction - Design through making...
Place (2012)
Installation (2012)
Waiting for christmas (2011)
Performance Space (2011)
The Recorder (2011)
"Rear Window" Poster (2011)
In between places (2010)
Lighting in design (2010)
Hotel Lobby - Merylebone (2010)
Paternoster Square (2009)
Furniture
Illustrations
Info
LinkedIn
Blog
Following
(1)
Green house (2013)
Deconstruction - Design through making - site research (2012/13)
Place (2012)
Installation (2012)
Waiting for christmas (2011)
Performance Space (2011)
The Recorder (2011)
"Rear Window" Poster (2011)
In between places (2010)
Lighting in design (2010)
Hotel Lobby - Merylebone (2010)
Paternoster Square (2009)
Furniture
Illustrations